179 Longwood AV, Boston, MA 02115

Addition in Boston, Massachusetts — $560,000

TypeAddition
CategoryCommercial
Declared value$560,000
ScopeReplacement of existing 220 kW engine genset with new 550 kW engine genset on roof of MCPHS, existing dunnage steel to be modified to accept the new engine enclosure and emission control unit. As with previous unit, waste heat recovery into hot water circuit to offset fired-boiler operations.
StatusOpen
Est. timeline2025-12-17 → 2026-06-17
Registered2025-12-17
Construction started🚧 2025-12-17
Address179 Longwood AV, Boston, MA 02115
ContactJeremy Smith
PermitBOS-ALT1771601

View on the live map →

More commercial construction in Boston, MA.