225 QUARRY ST, Philadelphia, PA 19106
New construction in Philadelphia, Pennsylvania
| Type | New construction |
|---|---|
| Category | Commercial |
| Scope | FOR THE ERECTION OF A SIX (6) STORY STRUCTURE OF TYPE I-A CONSTRUCTION AT THE BASEMENT THROUGH 1ST FLOOR AND TYPE III-B CONSTRUCTION AT THE 2ND THROUGH 6TH FLOORS. FOR USE AS ELEVEN (11) DWELLING UNITS (GROUP R-2) WITH ACCESSORY INTERIOR PARKING AND ACCESORY ROOF DECKS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IBC AND PHC APPROVAL. ELEVATOR STANDBY POWER TO BE PROVIDED PER 2018 IBC SECTION 1009.4.1. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK. **SEE PA-2024-001246 / MI-2024-001075 FOR BBS PROVISOS** [AMENDMENT 10/16/2024 FOR REVISIONS TO STRUCTURAL FOUNDATION COMPONENTS, WINDOWS / FACADE, VEHICULAR RAMP TO CELLAR, AND BUILDING ENTRY LAYOUT AS PER APPROVED AMENDED PLANS.] [AMENDMENT 2/13/2025 FOR THE INSTALLATION OF A HORIZONTAL EXIT AT THE 5TH AND 6TH FLOORS. ELEVATOR EMERGENCY STANDBY POWER NOT REQUIRED IN ACCORDANCE WITH 2018 IBC SECTION 1009.2.1 EXCEPTION #1. ALL WORK TO BE DONE PER APPROVED AMENDED PLANS. **SEE MI-2024-007525 FOR BBS VARIANCE WITH PROVISOS: TWO (2) HOUR RATED CORRIDOR WALLS PROVIDED AT 5TH AND 6TH FLOORS & TWO (2) HOUR RATED BEARING WALLS PROVIDED AT ALL FLOORS.**] [AMENDMENT 11/30/2025 FOR CHANGES TO UNIT LAYOUTS ON 4TH THROUGH SIXTH FLOORS AND NEW EXTERIOR WALL OPENINGS. ALL WORK TO BE DONE PER APPROVED AMENDED PLANS. **SEE MI-2025-006885 FOR BBS VARIANCE WITH PROVISOS: SPRINKLER HEADS MUST BE INSTALLED OVER WINDOWS**] |
| Status | Issued |
| Est. timeline | 2024-08-14 → ? |
| Registered | 2024-08-14 |
| Construction started | 🚧 2024-08-14 |
| Address | 225 QUARRY ST, Philadelphia, PA 19106 |
| Owner | 151 N 3RD ST LP |
| Contractor | G & M EFESTOS CONTRACTING INC |
| Permit | PHL-CP-2024-002558 |