2040 CHRISTIAN ST, Philadelphia, PA 19146
Addition in Philadelphia, Pennsylvania
| Type | Addition |
|---|---|
| Category | Commercial |
| Scope | FOR LEVEL III ALTERATIONS TO A HISTORICAL RELIGIOUS ASSEMBLY BUILDING FOR USE AS AN APARTMENT BUILDING (R-2 OCCUPANCY, WITH 87 DWELLING UNITS), ALTERATIONS TO INCLUDE MASONRY REPAIRS, AND THE ERECTION OF STRUCTURAL FRAMING, PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING IS FULLY SPRINKLERED IN ACCORDANCE WITH NFPA 13 AND STANDPIPES TO BE PROVIDED IN THE EXIT STAIRWAYS PER NFPA 14. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN 10 FEET OF THE BUILDING FACADE AND 25 FEET FROM THE TOWER FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.** ASBESTOS REMEDIATION REQUIRED ** EXCAVATION PERMIT REQUIRED PRIOR TO START OF BASEMENT EXCAVATION WORK** **A FIRE WATCH SHALL BE PROVIDED DURING NONWORKING HOURS FOR COMBUSTABLE CONSTRUCTION THAT EXCEEDS 40 FEET IN HEIGHT ABOVE THE LOWEST ADJACENT GRADE IN ACCORDANCE WITH THE IBC SECTION 3314.1** **ELEVATOR PERMIT REQUIRED FROM THE COMMONWEALTH OF PENNSYLVANIA** **SUBJECT TO THE FOLLOWING CONDITIONS OF APPROVAL FROM THE PHILADELPHIA HISTORICAL COMMISSION: PHC staff review required for: window and door shop drawings, masonry repointing, masonry repair, masonry replacement.** |
| Status | Issued |
| Est. timeline | 2026-05-18 → ? |
| Registered | 2026-05-18 |
| Construction started | 🚧 2026-05-18 |
| Address | 2040 CHRISTIAN ST, Philadelphia, PA 19146 |
| Owner | 2040 CHRISTIAN ST LLC |
| Contractor | TierView Construction LLC |
| Permit | PHL-CP-2024-005300 |