1421 TYSON AVE, Philadelphia, PA 19111
Addition in Philadelphia, Pennsylvania
| Type | Addition |
|---|---|
| Category | Commercial |
| Scope | FOR ALTERATIONS TO AN EXISTING TWO (2) STORY DETACHED STRUCTURE AND THE ERECTION OF A TWO (2) STORY ADDITION (TYPE V-B CONSTRUCTION) FOR THE EXPANSION OF A GROUP A-3 RELIGIOUS ASSEMBLY OCCUPANCY. EXISTING BUILDING AND ADDITION BOTH TO BE FULLY SPRINKLERED PER NFPA 13. ALL WORK TO BE DONE IN ACCORDANCE WITH 2018 IEBC CHAPTER 13 (PERFORMANCE COMPLIANCE METHOD) AND 2018 IBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION, AND EXCAVATION WORK. ** THIS PERMIT INCLUDES A DEFERRED SUBMISSION OF TRUSS SHOP DRAWINGS. PRIOR TO ON-SITE INSTALLATION OF TRUSSES, A PERMIT AMENDMENT IS REQUIRED FOR THE SUBMISSION OF THE TRUSS SHOP DRAWINGS FOR APPROVAL.** [AMENDMENT 3/20/2026 FOR CHANGES TO SPECIAL INSPECTIONS AGENCIES AS PER AMENDED STATEMENT OF SPECIAL INSPECTIONS FORM.] |
| Status | Issued |
| Est. timeline | 2026-02-13 → ? |
| Registered | 2026-02-13 |
| Construction started | 🚧 2026-02-13 |
| Address | 1421 TYSON AVE, Philadelphia, PA 19111 |
| Owner | NORTHEAST PHILADELPHIA IS, COMMONWEALTH OF PENNSYLVA |
| Contractor | BUILDING POWER INC |
| Permit | PHL-CP-2025-006362 |